Deep Interrogation of MRU

Deep Interrogation of Mechanical Refrigeration Unit

Challenge

A client in Sub-Saharan Africa was offered a pre-fabricated 2 x 25MMSCFD Mechanical Refrigeration Unit (MRU) as the best solution for making the most from its marginal field. Dissatisfied with the assessment of the MRU conducted by another engineering firm, the client instructed ZETA to assess the MRU with a fresh pair of eyes.

Our approach
With a digital twin and multi-physics study, we performed deep interrogation of key aspects of the MRU design vis a vis the client’s situation.
Results
We uncovered issues that impact both safety and performance. The most critical of our findings are those with serious safety implications. One of which is that the MRU does not have the capability to respond to a fire/gas/explosion emergency in a timely manner as is required by 29 CFR 1910.119 particularly 29 CFR 1910.119(f)(1)(i)(D). It means the operator will walk away, leaving its substantial investment to burn in the event of a fire.
We explored the option of retrofitting the plant with equipment and instruments to enable the plant response to an emergency as required by legislation and sound engineering practice. Unfortunately, the material selection appears to be inadequate for the P/T travel that will be occasioned by a blowdown. A possible solution would entail extensive engineering works and substantial financial implications.
We identified several other issues that all together saved the client of over $50M.
NOTE: We could have played along knowing that as an engineering company, a plant with such fundamental defects would mean more jobs for us (repair/modifications, retrofits, etc.) after installation. As always, we put the interest of the client over and above everything else.
We completed the study within three weeks including site survey in the United States.